Search Results
Found 17 results for "design"
Design-Build (Turnkey)
A single-contract construction model where one firm handles both design and execution, streamlining accountability and p...
FIDIC
A suite of construction contracts published by the International Federation of Consulting Engineers, organized around th...
Traditional Procurement (Design-Bid-Build)
A linear construction process where design and construction are handled by separate entities under distinct contracts.
Material Take-Off (MTO)
A detailed list of all the materials required for a project based on the design and specifications.
Value Engineering
Reviewing a project’s design and materials to find cost-saving opportunities without sacrificing quality.
Yellow Book
Conditions of Contract for Plant and Design-Build, for electrical and mechanical plant, and for building works, designed...
Red Book
Conditions of Contract for Construction for Building and Engineering works designed by the Employer.
Undefined Provisional Sum
A sum provided for work that is not completely designed, but for which the information required for a defined provisiona...
Defined Provisional Sum
A sum provided for work which is not completely designed but for which certain information like nature, construction, an...
Construction (Design and Management) Regulations (CDM)
Regulations placing duties on clients, designers, and contractors to coordinate health and safety throughout a project.
Variation Order
A formal instruction requiring alterations, additions, or omissions to the quality, quantity, or design of the works.
Silver Book
Conditions of Contract for EPC/Turnkey Projects, suitable for process, power, and private-infrastructure projects.
Green Book
Standard JBC form recommended for Kenyan building and engineering works of relatively small capital value and traditiona...
Ground Investigation
Examination of the site to determine ground nature, bearing capacity, and contamination levels.
Bending Moment
The reaction induced in a structural element when an external force or moment is applied to the element causing it to be...
Two-Stage Tendering
A process where a contractor is selected based on a preliminary bid, with detailed pricing provided later during a secon...
Building Code
A Building Code is a set of regional or national rules that specify the minimum standards for constructed objects, such...